×

During pipe, umbilical, flying lead lay

Performed using Installation vessel’s WROV (tether length permitting) or from assistance vessel

❑ Confirm laying within design corridor, monitor heading and cross-track distance

❑ Monitor product positioning at critical areas (initiation, laydown/CTL measurements, curves, crossings)

❑ Provide layback distance from vessel to the point of contact product-seabed to ensure correct lay tension during installation

Equipment: OAS, Video, Dual Heads Profiler, INS/DVL aided USBL positioning and / or LBL

  • Client
    Jason C. Williams
  • Budget
    $5000
  • Duration
    15 Days

Have Query ?

mail whatsapp